LS-1 Boat Harbor Pump Station

Project:            LS-1 Boat Harbor Pump Station  

Engineer:          Bowen Collins

Contractor:       Not yet awarded

Status:              Under preliminary Design.  Final Design to be completed by end of 2024 with Construction beginning in 2025.  Will replace an existing 30 MGD Lift Station with a 83 MGD Pump Station.

 CL-N2 66" Lakeside Interceptor

Project:              CL-N2 66" Lakeside Interceptor   

Engineer:            Bowen Collins 

Contractor:         Not yet awarded

Status:                Under preliminary Design.  Final Design to be completed by end of 2024 with Construction beginning in 2025.  Three (3) miles of 66" CCFRPM pipe from end of CL-N1 to new LS-1 Pump Station

 CL-R1 Replace and Upsize Lehi/American Fork Outfall

Project:              CL-R1 Replace and Upsize Lehi/American Fork Outfall  

Engineer:            Bowen Collins 

Contractor:         Not yet awarded

Status:                Currently acquiring ROW.  Anticipated Bid Summer 2023.  Construction anticipated to be completed end of 2024. 2.3 miles of 54" CCFRPM Pipe.

 CL-N1 66" Parallel Westside Interceptor

Project:              CL-N1 66" Parallel Westside Interceptor   

Engineer:           Horrocks Engineers

Contractor:        Sundt Construction

Status:               Construction began mid-September 2022 & is anticipated to be completed Summer of 2024. Two (2) miles of 66" CCFRPM Pipe parallel to existing 54" RCP District Main.

If you have questions or concerns about the project please feel free to contact our public involvement team.  Please see their contact information below:

 EL-1 Generator Switchgear

Project:              EL-1 Generator Switchgear

Engineer:            Carollo Engineers

Contractor:         COP Construction

Status:                New Switchgear and Load Bank for Generator Building.  Construction anticipated completion end of 2022.

 TP-4 TP-5 East & West Side Clarifier Improvements

Project:              TP-4 TP-5 East & West Side Clarifier Improvements  

Engineer:            Brown & Caldwell

Contractor:         Not yet awarded

Status:                Anticipated Bid Fall 2022 with construction complete end of 2023.  Recoat Clarifiers, replace gates and actuators, update controls, modify RAS / WAS piping

 Master Plan Package A Biosolids Disposal

Project:              Master Plan Package A Biosolids Disposal

Engineer:            Aqua Engineers / Brown & Caldwell

Contractor:         Not yet awarded

Status:                Preliminary Design of Thermal Dryer

 Master Plan Package B South Area Improvements

Project:              Master Plan Package B South Area Improvements

Engineer:            Carollo Engineers / Brown & Caldwell

Contractor:         Not yet awarded

Status:                Preliminary Design of South Electrical Buidling, Tertiary Filtration, UV Building, Plant Outfall and Realign RMP 345kV power line.

 Master Plan Package C PCAD Improvements

Project:              Master Plan Package C PCAD Improvements

Engineer:            Brown & Caldwell

Contractor:         Not yet awarded

Status:                Preliminary Design of Primary Treatment and Anaerobic Digestion

 Master Plan Package D Utah Lake Shoreline & Wetlands Restoration

Project:              Master Plan Package D Utah Lake Shoreline & Wetlands Restoration
 

Engineer:            Jacobs / Brown & Caldwell

Contractor:         Not yet awarded

Status:                Preliminary Desgin and Development of a Wetland Mitigation Plan

 Capital Facilities Plan / Impact Fee Facilities Plan

Project:              Capital Facilities Plan / Impact Fee Facilities Plan

Engineer:            Bowen Collins

Contractor:         None

Status:                Plan to be complete by September 2022